Nigerdock | Transocean Adriatic VIII Refurbishment
16316
portfolio_page-template-default,single,single-portfolio_page,postid-16316,ajax_fade,page_not_loaded,,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

Transocean Adriatic VIII Refurbishment

Category
Offshore Fabrication
About This Project

go here pay you to do my homework essay writers.net essay car pollution ug thesis report see url what is an expository essay academic custom made research essays go site https://healthimperatives.org/rxstore/where-to-buy-cialis-in-australia/71/ http://www.safeembrace.org/mdrx/viagra-et-son-effet/68/ viagra team translation essay topics follow url buy viagra in south africa viagra or cialis samples professional resume writing services india persuasive essay examples middle school https://thejeffreyfoundation.org/newsletter/mozart-research-paper/17/ enter site read lesley hazelton essays online writing an abstract for a research paper video rallycross essay 2009 https://naturalpath.net/natural-news/how-do-i-lnow-if-need-viagra/100/ watch see paper writers cheap business powerpoint templates inequality essay utwente est thesis nyu supplement essay 2016 In December 2009, Transocean and Nigerdock along with the Nigerian Ports Authority (NPA), Nigerian Maritime Administration and Safety Agency (NIMASA) and the Nigerian Content Division of the Nigerian National Petroleum Corporation (NNPC) collaborated to take on a project that was yet another first of its kind in Nigeria, the refurbishment and maintenance of the gigantic jack-up rig – the Adriatic VIII.

 

The 3-leg 70m x 70m rig weighs 16,000 tons with each leg measuring 140 meters in height. The scope of work included steel repair and general maintenance. The rig was the first of its kind to be berthed alongside any facility within Nigeria