Nigerdock | Chevron Meji Platform & Chevron Okan Platform
16544
portfolio_page-template-default,single,single-portfolio_page,postid-16544,ajax_fade,page_not_loaded,,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

Chevron Meji Platform & Chevron Okan Platform

Category
Offshore Fabrication
About This Project

custom blog post editor sites for masters write a narrative essay on the topic the happiest day of my life follow link see url thesis art history are research papers written in first person https://teleroo.com/pharm/no-persription-viagra/67/ international business dissertation source url enter site qualities of a good essay writing service manager cover letter go to link self esteem essay human trafficking thesis statement analysis research paper example https://dvas.org/proscar-online-prescription-8958/ steps to writing a proposal paper https://lynchburgartclub.org/kosmos-essays-in-order/ https://nebraskaortho.com/docmed/what-is-viagra-super-force/73/ best presentation writing for hire gb best essay for you https://healthimperatives.org/rxstore/levitra-aspiren/71/ does generic viagra work the same as the real stuff viagra max safe dose https://thedsd.com/myself-essay/ how do i delete my email address on my ipad college essays on being different source site go http://jeromechamber.com/event/mobile-application-thesis/23/ in viagra woman The Chevron Escravos Gas Project Phase 3A (EGP3A) was awarded to Nigerdock in August 2005, for the fabrication of the Meji and Okan Platforms. The award package included the fabrication of the Meji GGCP jacket & piles, Meji GGCP flare bridge and support tripod, Meji GGCP to Meji RP utility bridge, Okan NWP jacket and piles.

 

The overall scope for the project included the expansion of existing facilities, construction of an onshore gas treatment plant, modification of the floating, storage and offloading (FSO) unit and the fabrication of the two offshore platforms.

 

Nigerdock’s scope included the fabrication, shop engineering, installation of piping, electrical instrumentation, painting, mechanical completion, load out and sea fastening.