Nigerdock | Exxon Mobil Erha Fabrication
16642
portfolio_page-template-default,single,single-portfolio_page,postid-16642,ajax_fade,page_not_loaded,,qode-theme-ver-10.1.1,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

Exxon Mobil Erha Fabrication

Category
Offshore Fabrication
About This Project

In October 2012, Nigerdock was awarded the contract for Erha North Phase 2 Project. The items to be fabricated under this contract include Subsea Structures (various SHOs, FLETs, ITAs, Step over Module, Crossing Supports), Jumpers (various production jumpers insulated and water injection jumper uninsulated), Topsides (Pipe Supports, Piping Prefabrication Carbon & Stainless Steel, Pig Receiver), Riser Protector and Spreader Bars.

The total weight of items fabricated was 1440 tons.

Under this contract, Nigerdock provided 48,992 man-hours of Human Capacity Development training for 94 Nigerians youth. The man-hours were solely utilized for National Human Capacity Development; an initiative of Nigerian Content Development Monitoring Board
The Erha North Phase 2 development is an extension of the existing Erha subsea system and infrastructure, which is currently producing to the existing Erha Floating Production, Storage and Offloading (FPSO) vessel located in OML 133 in Nigerian waters (in water depth ranging from 1000 to 1200m).